Construction Notice – FM-552 TXDOT Maintenance Project SH-205 to SH-66 (Fate)

TXDOT will be performing maintenance on FM-552, from SH-205 in Rockwall to SH-66 in Fate. The project includes adding 3-foot shoulders to each side; reconstructing the sub-grade and resurfacing the road. The project is tentatively scheduled to begin early January 2012. Construction time is 188 working days (20 days per month). During the day the road will be reduced to one lane in the construction area with flagmen for traffic routing. The road will be open in both directions during non-construction times (nights and weekends). At various times during the sub-grade reconstruction, the roadway will have a gravel surface. Expect delays during construction.

Please contact Kerry Lively, TXDOT Project Manager, at 972-962-3617 or Chuck Todd, Rockwall City Engineer, at 972-771-7746, with questions about the project.

Speak Your Mind

QR Code Business Card